During commissioning
AVENTICS | MC | 1987765452–BDL–001–AE
W
Ground the modules and valve system. Observe the
following standards when installing the system:
– DIN EN 50178, classification VDE 0160
– VDE 0100
W
Installation may only be performed in a voltage-free and
pressure-free state and only by a qualified technician. In
order to avoid accidents caused by dangerous movements
of the actuators, electrical commissioning may only be
carried out in a pressure-free state.
W
Do not put the system into operation before it is completely
assembled as well as correctly wired and configured, and
after it has been tested.
W
Make sure that there is a sufficient exchange of air or
enough cooling if your valve system has any of the following:
– Full equipment status
– Continuously loaded solenoid coils
W
Exhaust noises in the valve system may reach an
unpermitted level. Take measures to soundproof the
system, if necessary.
3
System Overview
The valves are completely mounted and tested according to
your requirements. I/O modules are installed in the system as
per your specifications. Its modular construction allows existing
systems to be expanded or converted at any time.
The valve system's operating instructions are composed of
individual components.
41
System Overview