5. INSTALLATION
The packaging kit contains:
1. Column and head with weighing system
2. Column anchor rod (rod inside the column)
3. Base with rubber platform
4. Telescopic stadiometer measurement height
5. Wheels for transportation
6. Mounting kit 8 various screws and 1 key
7. Instruction manual
STAGE 1: Assembling the column base
CAUTION! Keep the base and the platform close to each other during the tipping, in order
to prevent the levers bushing to stick out.
Place the scales column in horizontal position on a table (Fig. 3)
1.
Untie the cables which block the levers.
2.
Take out the anchor rod using the key and hook the base long lever until it is linked to the column
anchor rod (Fig. 3-1)
Carefully place the scales on the ground.
Disconnect the cables
Connection between steelyard and long lever
18
C201/202 REV.02 - 16/12/2016