Commissioning; Operation; Maintenance - Schluter Systems Liprotec LT EKE 24V15W Manual De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 124
Place the housing cover (see Fig. D, Item 1) on the power pack.
Screw down the housing cover.
7

Commissioning

Proceed as follows to commission a power pack:
Make sure that all consumers are mounted and connected correctly.
Plug the power pack's mains plug into a professionally earthed protective contact
socket (230 V, 50 Hz).
If you use an on-site light switch (see Chapter 6.1 entitled "Connection variants"), switch
the power pack on using the connected light switch.
If the lighting does not work properly, switch it off again and continue reading in Chapter
10 entitled "Elimination of faults".
8

Operation

The power pack does not having control or switch elements.
If you have connected the power pack to an on-site light switch, you can turn it on and off
with this.
If you have switched a receiver between the power pack and LED strip, read the operating
instructions of the receiver.
9

Maintenance

Possibility of electric shocks due to improper power pack maintenance!
Electric shocks can lead to severe or deadly injuries.
Before carrying out any work, make sure that the power pack's mains plug is
unplugged.
Wait 10 seconds after unplugging the mains plug.
Keep water and other liquids away from the power pack.
Clean the power pack once a year with a soft, dry cloth.
Get a qualified electrician to check the screwed fittings of the cable connections once a
year.
Directions for use for the power pack
DANGER
EN
Commissioning
27
Tabla de contenido
loading

Tabla de contenido