Machine Set Up & Installation - Clarke CA90 32T Instrucciones De Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

A - ENGLISH
MACHINE SET UP & INSTALLATION
UNCRATING MACHINE
Be sure and check packing carton for any damage. Immediately report
any damage to carrier. Check contents of package to ensure that the
following
items are included: Machine, batteries (x6), squeegee assembly, battery
charger and pad drivers. (Batteries and charger may be on separate
skid)
BATTERY CONNECTIONS
The batteries and charger are shipped separately and will need to be
installed and connected as shown in the diagram below.
WARNING !
Batteries emit hydrogen gas. Explosion or fi re can result from
hydrogen gas. Keep sparks and open fl ames away! Keep battery
compartment open while charging.
1.
Be sure the power switch is in the "off" position.
2.
Open recovery tank to gain access to battery compartment.
3.
Carefully place the six batteries into the compartment as shown in
fi gure below. Place the battery brace at the rear of the batteries.
4.
Connect battery cables to posts in order as shown in diagram
below. (RED to POSITIVE and BLACK to NEGATIVE)
5.
Apply a coating or protective spray on the cable connections to
prevent battery corrosion.
DO NOT DROP THE BATTERIES INTO COMPARTMENT!
A - 4
INSTRUCTIONS FOR USE
CA90 32T - 56091127
PRE-OPERATION CHECKS
1.
Sweep or dust mop the surface to be cleaned.
2.
Check battery meter to make sure batteries are fully charged. (SEE
BATTERY CHARGING)
3.
Ensure squeegee is properly installed.
4.
Ensure that brush/pad is properly installed.
INSTALLING PAD DRIVERS OR BRUSHES
1.
Ensure the machine is turned off.
2.
Raise the brush head assembly off the fl oor by pushing on the
brush lift button on the control console.
3.
Slide back the viewing window panel on the aluminum deck
housing.
4.
If using a pad driver, fi rst attach the appropriate pad to the bottom
of the driver.
5.
Slide the pad driver under the deck and look through the viewing
panel and line the three lugs with the three holes in the drive motor
hub. Once in the holes, rotate the driver toward the spring clip to
lock the driver in place
MOUNTING THE SQUEEGEE
1.
Pull the squeegee lift lever to raise the squeegee bracket up.
2.
Loosen the two knobs on the squeegee and slide the squeegee
into the slots at the rear of the squeegee bracket. (the wheels on
the squeegee point to the back)
3.
Tighten the knobs securely.
4.
Secure the vacuum hose on the pick-up tube of the squeegee.
FILLING THE SOLUTION TANK
1.
The CA90 32T can only be fi lled in the rear of the machine. There
is a fi ll cap that can be removed so the tank can be fi lled with a
hose.
2.
Fill the solution tank with up to 30 gallons of water. (water
temperature should not exceed 140 degrees F)
3.
The clear tube under the fi ll port has gallon markers to help
determine the water level in the solution tank.
WARNING !
Do not put any fl ammable materials into solution tank. This can
cause an explosion or a fi re. Only use recommended cleaning
chemicals. Contact your Clarke distributor for recommended
chemicals.
7/2014
Tabla de contenido
loading

Este manual también es adecuado para:

56091127

Tabla de contenido