Set Up
•
Installation
•
Controlling Board
Machine connection
•
Installation
•
This machine should be mounted through the screw
holes of truss. Safety wire is a must to fix fixture well.
Make sure truss and safety wire have strong load capaci-
ty to bear 3 times weight than fixture at least.
•
This machine should be installed by qualified technician.
Controlling Board
3
6
BEAMER 7R
ENGLISH VERSION
1
2
4
5
1. LCD Display.
Shows menu
2. Display Control Button.
Buttons: Menu, UP, Down, Enter
3. Power Switch
Power on and power off
4. DMX In
Connect signal cable to let DMX signal input
5. DMX Out
Connect signal cable to let DMX signal output
p. 4