Transportation And Handling; Before Operation - Hitachi SET FREE MINI SERIE Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29

TRANSPORTATION AND HANDLING

Start-up and Operation: Check to ensure that all the stop valves are fully opened and no obstacle exists at the inlet/outlet sides
before start-up and during the operation.
Maintenance: Periodically check the high pressure side pressure. If the pressure is higher than the maximum allowable pressure,
stop the system and clean the heat exchanger or remove the cause.
Maximum Allowable Pressure and High Pressure Cut-out Value:
Refrigerant
R410A
?
N O T E
The label for the vessel under PED are attached on the high pressure
vessel. The pressure vessel capacity and vessel category are indicated
on the vessel.
Location of high pressure switch
Compressor
4 TRANSPORTATION AND HANDLING
When hanging the unit, ensure a balance of the unit, check
safety and lift it up smoothly. Two or more personnel should be
used to move the unit
Do not remove any packing materials.
Hang the unit under packing condition with 2 rope.
For safety reasons ensure that the outdoor unit is lifted smoothly
and does not lean.
Model
RAS-(4-6)FSVN3E
RAS-(4-6)FSNY3E

5 BEFORE OPERATION

!
C A U T I O N
Supply electrical power to the system for approximately 12
hours before start-up or a long shutdown. Do not start the system
immediately after power supply, it may cause a compressor failure
because the compressor is not heated well.
When the system is started after a shutdown longer that approximately
3 months, it is recommended to check the system by your service
contractor. Turn OFF the main switch when the system is to be
stopped for a long period of time: If the main switch is not turned OFF,
electricity will be used, because the oil heater is always energised
during compressor stopping.
3
PMML0389B rev.1 - 07/2016
Maximun allowable pressure (MPa)
4.15
Oil separator
Unit Gross Weight
113
115
High pressure switch cut-out value (MPa)
4.00 ~ 4.10
?
N O T E
The high pressure switch is indicated on the electrical wiring diagram in
the outdoor unit as PSH connected to printed circuit board (PCB1) in the
outdoor unit
Structure of High Pressure Switch
Contact Point
Connected to the electrical wire
!
D A N G E R
Do not change the high-pressure switch locally or change the
high pressure cut-out set value locally. If changed, it will cause
serious injury or death due to explosion.
Do not attempt to turn service valve rod beyond its stop.
> 60º
0.7 -1.0 m
Make sure that the outdoor unit is not covered with snow or ice. If
covered, remove it by using hot water (approximately 50°C). If the
water temperature is higher that 50 °C, it will cause damage to plastic
parts.
Pressure Detected
< 20º
3 5
3
Tabla de contenido
loading

Tabla de contenido