GB
PNG-PN 25
Additional information on the chapter
"Loading fasteners":
1. Open the magazine slide (item 05) until
the pin pusher guide (item 14) engages
(Figure 2a).
2. Load pin nails (Figure 3a).
3. Close the magazine (item 04).
1.7
EC Declaration of Con-
formity
Pin nailer
PNG-PN 25
Year of CE mark: 2009
We declare under our sole responsibility that
this product complies with the following
guidelines and standards:
DIN EN ISO 12100;DIN EN 792;
BGR 500;
98/37/ EC (before 28.12.2009),
2006/42/ EC (after 29.12.2009).
pp Marco Lodni
Head of Development/Testing
03.2009
Schneider Druckluft GmbH
Ferdinand-Lassalle-Str. 43
72770 Reutlingen
I/ 4
Serial no.
G300068