Marvel MP15CPG2 Serie Instrucciones De Instalación, Operación Y Mantenimiento página 25

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PREPARING THE ICE MACHINE FOR STORAGE
7. Disconnect the water valve's outlet water line to the
reservoir and drain the remaining water left in the water
line trap area. (See Figure 38 and Figure 38a).
Figure 38
To disconnect the water outlet
line: Push up on the white collar
and pull the plastic water line
from the bottom of the water
valve.
To reconnect the water outlet
line: Simply insert the plastic
tubing into the white collar and
push until it stops (about
mm, of water line will enter the
valve).
", 12
1
2
Figure 38a
Plastic outlet
water line
8. Reconnect the water valve outlet water line.
(See Figure 38 and Figure 38a).
9. Reinstall the ice machine's access cover.
10. Clean and dry the ice machine's storage bin.
11. Prop the door open for air circulation to prevent mold
and mildew.
12. Leave the water supply line disconnected or reconnect
the supply line and leave it shut off. Do NOT turn the
water on and allow water to enter back into the water
valve.
13. Install the winterization plug in the water drain hole
inside the ice bin. (See Figure 39).
Winterization
White
collar
25
plug
Figure 39
Tabla de contenido
loading

Este manual también es adecuado para:

Mp15cps2 serieMp15cpp2 serie

Tabla de contenido