Boiler Description; Installation Regulations; Installer Manual-User Manual - Beretta Quadra II 24 C.A.I. Instrucciones De Instalacion Y Uso Y Cuidado

Ocultar thumbs Ver también para Quadra II 24 C.A.I.:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

EN
INSTALLER
1 - GENERAL SAFETY DEVICES
Our boilers are built in our plants and checked down to the
smallest detail in order to protect users and fi tters from injury.
After working on the product, qualifi ed personnel must check
the electrical wiring, in particular the stripped part of conduc-
tors, which must not stick out from the terminal board, avoid-
ing possible contact with live parts of such conductor.
This instruction manual, together with the user manual, are
integral parts of the product: make sure that they remain with
the appliance, even if it is transferred to another owner or
user, or moved to another heating system. In case of loss
or damage, please contact your local Technical Assistance
Service for a new copy.
Boiler installation and any other assistance and maintenance
operation must be carried out by qualifi ed personnel accord-
ing to current local and national regulations.
The installer must instruct the user about the operation of the
appliance and about essential safety regulations.
This boiler must only be used for the application it was de-
signed for. The manufacturer declines all contractual and
non-contractual liability for injury to persons or animals or
damage to property deriving from errors made during instal-
lation, adjustment and maintenance and from improper use.
After removing the packaging, make sure the content is in
good conditions and complete. Otherwise, contact the dealer
from who you purchased the appliance.
The safety valve outlet must be connected to a suitable col-
lection and venting system. The manufacturer declines all li-
ability for any damage caused due to any intervention carried
out in the safety valve.
Dispose of all the packaging materials in the suitable contain-
ers at the corresponding collection centres.
Dispose of waste being careful not harm human health and
without employing procedures or methods which may dam-
age the environment.
The ventilation openings are vital for correct combustion.
During installation, inform the user that:
- in the event of water leaks, the water supply must be shut off and
the Technical Assistance Service must be contacted immediately
- the operation pressure of the hydraulic system must be within 1
and 2 bar, and therefore, must no exceed 3 bar.If necessary, reset
the pressure as indicated in the paragraph entitled "Filling the
system"
- if the boiler has not been used for a long time, it is recommended
that the Technical Assistance Service performs, at least, the fol-
lowing operations:
• turn "off" the main switch of the appliance and the general
switch of the system
• close the gas and water taps on both the heating and domes-
tic hot water circuits
• drain the heating and domestic hot water circuits to prevent
freezing
- boiler maintenance must be carried out at least once a year. This
should be booked in advance with the Technical Assistance Ser-
vice.
For safety, always remember that:
The boiler should not be used by children or unassisted disabled
people.
In some parts of the manual, some symbols are used:
WARNING = for actions requiring special care and adequate
preparation
FORBIDDEN = for actions THAT MUST NOT be performed
It is dangerous to activate electrical devices or appliances, such
as switches, home appliances, etc., if you smell gas or fumes.
In the event of gas leaks, ventilate the room opening doors and
windows; close the gas general tap; contact the qualifi ed per-
sonnel from the Technical Assistance Service immediately.
Do not touch the boiler while barefoot or if parts of your body
are wet or damp
Before cleaning operations, disconnect the boiler from the
main power supply by turning "OFF" the two position system
switch and the main control panel switch
Do not modify safety and adjustment devices without the
manufacturer's permission and relative instructions
Do not pull, disconnect or twist the electric cables coming
out of the boiler even when it is disconnected from the main
power supply
Avoid covering or reducing the size of ventilation openings of
the installation room
Do not leave infl ammable containers and substances in the
installation room
Keep packaging materials out of reach of children.
Do not cover or reduce the size of the ventilation openings in
the room where the boiler is installed. The ventilation open-
ings are vital for correct combustion.

2 - BOILER DESCRIPTION

Quadra II C.A.I. is a wall-mounted type B11BS boiler for heating
and the production of domestic hot water. This type of appliance
cannot be installed in bedrooms, bathrooms or showers, or in
rooms with open fl ues without adequate ventilation.
The Quadra II C.A.I. boiler is fi tted with the following safety de-
vices:
- Safety valve and water pressure switch intervening in cases of
insuffi cient or excessive water pressure (max 3 bar-min 0.7 bar).
- Temperature limit thermostat intervening by putting the boiler into
safety stop if the temperature in the system exceeds the limit ac-
cording to current local and national regulations
- Fumes thermostat intervenes by blocking the boiler into a safety
standstill status if there is a spillage of combustion products in
the hood; it is located on the right hand tile of the vent-damper
draught breaker device Intervention of safety devices indicates
a potentially dangerous boiler malfunction; contact the technical
assistance service immediately.
The fl ue gas thermostat not only intervenes for a fault in the com-
bustion products outlet system, but also with various atmospheric
conditions. One can therefore try to start up the boiler again after
waiting a short while (see fi rst ignition section).
Repeated intervention of the fumes thermostat signifi es
evacuation of combustion products into the boiler room with
possibly incomplete combustion and formation of carbon
monoxide, a highly dangerous condition. Call the techni-
cal assistance service immediately.
The boiler must never be put into service, not even temporar-
ily, if the safety devices are not working or have been mis-
handled.
Safety devices must be replaced by the technical assistance
service, using original manufacturer parts only; see the spare
parts catalogue supplied with the boiler.
After repairs carry out a trial ignition.

3 - INSTALLATION REGULATIONS

3.1 Installation regulations
Installation must be carried out by qualifi ed personnel.
Always comply with national and local regulations.
Quadra II 24 C.A.I.
3
Tabla de contenido
loading

Tabla de contenido