Beko OWAMAT 12 Instrucciones De Montaje página 14

Installation • Instalación
Installation • Instalação
Allgemeine bauaufsichtliche Zulassung
Deutsches Institut für Bautechnik, Berlin
Zulassungs-Nummer Z-83.5-9

english
The ÖWAMAT oil-water separator has
been approved for the treatment of
compressor condensates by the Institute
of Construction Engineering, Berlin. In
Germany, it is therefore not necessary
to apply for an operating permit.
Please check the relevant legal regula-
tions in your country. You should also
contact the public authorities in your area,
since there may be regional variations.
. Area of installation
• Sealed floor or spill basin! It is crucial
to ensure that untreated condensate or
oil cannot get into the sewer system in
the event of damage.
• The floor area must be stable and level
(max. inclination 1°) to ensure reliable
functioning of the ÖWAMAT.
Oil collector connection
• Place collector on the same floor level as
the ÖWAMAT to ensure oil discharge.
• Firmly screw the oil outlet pipe to the
collector so that oil cannot leak out (not
even in the event of ÖWAMAT overload-
ing).
2. Inflow
Up to 4 feed points can be connected
directly to the ÖWAMAT.
If there are more than 4 feed points, it will
be necessary to lay a collecting line.
• Ring system along the wall:
- nominal diameter 1" (DN 25)
- above ÖWAMAT inlet (height above
floor)
- slight slope down to the ÖWAMAT unit
(min. 1°)
• Feed in the condensate from the top
into collecting line (swan-neck pipe
bend)
ÖWAMAT 12, 14, 15, 16
loading

Este manual también es adecuado para:

Owamat 14Owamat 15Owamat 16