Altrad BELLE BULLDOG Manual Del Operador página 26

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
The following schedule details the attentions considered necessary to ensure satisfactory operation of the power unit.
NOTE:- The attentions and periods summarised in the schedule are the initial recommendations and should be revised to suit the
Power Unit working conditions.
Item
Attention
Keep all areas clean and free from dust, debris etc.
Complete Unit.
Check security of all fasteners especially on engine mountings.
Wheels and Feet.
Examine for damage.
Examine for leaks or damage.
Transmission
Hoses.
Check for the correct positioning of the protective sleeves.
Check oil level.
Examine mountings.
Engine.
Examine exhaust silencer for damage of deterioration.
Check for excess vibration when running.
Check oil level.
Hydraulic Tank.
Change Hydraulic Oil.
Externally clean using compressed air.
Oil Cooler.
DO NOT USE A WIRE BRUSH
Return Line Filter.
Hydraulic pipes /
Examine for oil leaks.
connectors.
System Pressure and Flow Checks
relief valve setting is correct. The hydraulic oil will tend to get quite hot during this operation and therefore the checking should be
carried out as quickly as possible and the load valve opened before excessive temperatures are reached.
DO NOT EXCEED 3600 RPM (2900 RPM for Major 30-140)"on load" .
speed then the pump must be replaced
Service & Maintenance
26
First 50
10
100
Hours
Hours
Hours
300
Hours
Tabla de contenido
loading

Este manual también es adecuado para:

Belle hpp

Tabla de contenido