Replace The Base Grille; Start The Icemaker - GE PSC23MGPCWW Manual Del Propietario E Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7

REPLACE THE BASE GRILLE

Replace the grille by installing the two
Phillips head screws.
SET THE CONTROLS
8
Set the controls to the recommended
setting.
Installation Instructions
29
9

START THE ICEMAKER

Set the icemaker power switch to the
I (on) position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.
Power
switch
NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.
Tabla de contenido
loading

Tabla de contenido