S&P HIB Manual De Instalacion Y Uso página 15

Ventiladores helicoidales murales
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ENGLISH
PLATE MOUNTED AXIAL FLOW FANS: HIB/HIT
INSTALLATION AND OPERATION MANUAL
1.
INTRODUCTION
The installation and operation manual is the training reference document written
by S&P, it is intended for installers and technical operators who will be in
contact with the machine throughout its life cycle.
The aim of this manual is to provide the necessary information for the correct
installation and operation of the equipment, highlighting the hazards that may
arise from incorrect use.
For an optimal use and operation of the machine, it is essential to strictly adhere
to the instructions set forth in the manual avoiding, above all, any technical
problems and exposing operators to health risks.
The extractor is regulated by the Machinery Directive 2006/42/EC. The EC
mark certifies conformity of the product with the essential safety requirements of
the aforementioned European Community Directive.
1.1
INTENDED USE AND LIMITATIONS
The HIB / HIT ranges comprise air extractors for agricultural and industrial
applications, designed to ventilate enclosed areas by extracting the air at
atmospheric pressure. They are to be installed in walls / perimeter structures.
The machine is designed to operate at a room temperature between: 0°C and
+40°C
It is strictly forbidden to modify any product components or to replace them with
non-original spares.
WARNING: Any use of the product other than those described herein is
deemed improper and therefore unsafe. Such non-intended uses may cause
serious injury and damage the equipment. Any non-intended use or any use of
the product not described herein is considered non-compliant and, therefore,
the manufacturer shall refuse all liability.
15
Tabla de contenido
loading

Este manual también es adecuado para:

Hit

Tabla de contenido