Brasilia ACTION LADY Manual De Instrucciones página 11

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Pict. 1 Installation
1 - Main switch
2 - Coffee delivery switch
3 - Water delivery push-button
4 - Cappuccino delivery switch
5 - Coffee delivery group
6 - Filter holder
7 - Drain
8 - Grid
9 - Water tank cover
10 - Water tank
11 - Steam boiler push-button
12 - Milk frothing device
13 - Milk aspiring pipe
14-
Power supply cord
15-
Hot water deliverer
16- Steam boiler warning light
Before installing the machine it is advisable to check the efficiency of the electrical connections (n° 1 pict. 1).
An electric cut-out with fuses rated for the machine's electrical input is needed for the machine to be properly connected. Attention: the earth connection
(yellow/green wire) is mandatory. Make the electrical connections, connecting the power supply cord (n°13 fig.1) to a suitable power socket (220 V
or 110 V) fitted with a safety switch.
Fill the tank (n°10 pict.1) with water, prefereably softened (the use of pure drinking water is recommended for machines not connected to
the mains) . Finally, the efficiency of the main drain pipe must be checked before it is connected to the machine's drain pipe.
For machines connected to the mains, find a suitable position for the water softener. Connect the softener to the water mains tapand to the machine's
water inlet. Place a recipient under the water softener's discharging pipe (see regeneration instructions). Open tap and run the water through for a few
minutes to clean the softener.
Before starting the machine up, press the water delivery push-button (n°3, pict.1) and wait for water to emerge from the spout (n°15).
At this point the boiler will have been filled with water.
Now press the main switch (n°1 pict.1) and wait a couple of minutes.
The machine has now reached the optimal temperature and is ready for use.
It is recommended to keep the machine always switched on in cases where it is in daily use.
Attention: check that the tank (n° 10) is always full of water.
After having started machine up, put one of the filters (for 1 or 2 cups) into the filter-holder (n°6).
The following should be considered general lines of operating.
It is thus essential to follow the manufacturer's instructions and regulations as regards safety.
Operating the machine is very simple and the checks that the operator must make to obtain good coffee are:
- use suitably softened fresh mains water or pure drinking water
- boiler water temperature between 100°C and 130°C inclusive
- delivery time 20-30 seconds
- ground coffee dose between 6 and 7 g. inclusive
- constant cleaning of the coffee dosing grinder
- checking the wear of the dosing grinder's grindstones
- Coffee delivery temperature: 85/92°C
The temperature depends on the type of blend used; it can be checked with a precision thermometer during delivery.
- Use only fresh refrigerated milk, max. temperature +4°C.
Action Lady
Pict. 1
Location and connections
Start-up
USER INSTRUCTIONS
rev.4 - 08/2004
Pict. 2 Milk frothing device
1 - Milk frothing device
2 - Cover
3 - Air regulating stud
4 - Milk aspiring pipe
5- Milk flow regulator
Pict. 2
11
Tabla de contenido
loading

Productos relacionados para Brasilia ACTION LADY

Tabla de contenido