General Sinter programs Cercon® xt ML all shades
Material:
Sinter program for bridge frameworks
up to 3 units
Speed-Sinter program for bridge frameworks
up to 3 units
Material:
Sinter program for bridge frameworks up to
3 units
Speed-Sinter program for bridge frameworks
up to 3 units
Material:
Sinter program for bridge frameworks up to
3 units
Speed-Sinter program for bridge frameworks
up to 3 units
1) Room temperature
2) valid for closed sinter bowls, otherwise 1520°C
Sintering programs, Multimat2Sinter / heat DUO / inFire HTC-speed sintering furnace:
Cercon® xt ML speed sintering:
Heating rate
Temperature
Step
°C / min
S4
70
S3
70
S2
70
S1
70
Sintering temperatures are recommendations. If necessary, carry out a trial sintering cycle and adapt the sintering temperatures or times as needed.
6
Start-
Ramp
Temp.
time
°C
min
RT
40
1)
RT
90
1)
Start-
Ramp
Temp.
time
°C
°C / min
RT
22
1)
RT
17
1)
Start-
Ramp
Temp.
time
°C
°C / h
RT
1320
1)
RT
1)
1020
Holding time
°C
min
750
0
1 100
0
1540
35
0
0
Holding
Ramp
Temp. 1
time
time
°C
min
min
900
0
55
1540
35
20
2)
Holding
Ramp
Temp. 1
time
time
°C
min
°C / min
900
0
11
1540
35
18
2)
Holding
Ramp
Temp. 1
time
time
°C
h : min
°C / h
900
00 : 00
660
1540
2)
00 : 35
1080
Cercon® xt ML standard sintering:
Heating rate
Step
°C / min
S4
31
S3
30
S2
11
S1
22
Holding
Temp. 2
time
Cooling
°C
min
With closed furnace
1500
145
cooling down to 200 °C
Gradual opening of the furnace
1150
0
within 35 Min down to 200 °C
Holding
Temp. 2
time
Cooling
°C
min
With closed furnace
1500
145
cooling down to 200 °C
Gradual opening of the furnace
1150
0
within 35 Min down to 200 °C
Holding
Temp. 2
time
Cooling
°C
h : min
With closed furnace
1500
02 : 15
cooling down to 200 °C
Gradual opening of the furnace
1150
00 : 00
within 35 Min down to 200 °C
Temperature
Holding time
°C
min
300
0
750
0
1520
130
880
0