PAW DN 20 Manual De Instrucciones página 18

Ocultar thumbs Ver también para DN 20:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

4 Assembly [specialist]
Heating circuit connection
Return
Flow
Flow
Return
Boiler connection
Keep in mind that the flow is connected to the pipe connection marked "V" and the return is
connected to the pipe connection marked "R". The flow and the return cross each other (see
figure).
All connections marked "V" must be connected to the flow chamber, all connections marked "R"
must be connected to the return chamber.
On the lateral ends of the hydraulic separator are ½" connections suitable for a flow sensor
and/or a drain valve. In the figure above the right connection is connected to the flow chamber
and the left to the return chamber.
B-6
993x42-mub-ml – V03
2008/11
Tabla de contenido
loading

Este manual también es adecuado para:

Dn 25Dn 32

Tabla de contenido