3.2 Procedures:

To operate a good installation of the
gear motors GR 400, follow these
instructions:
1 - Open the box and take out gear
motor. Make sure that it has not been
damaged during the transport.
2 - Make sure that the leaf of the gate
is perfectly horizontal.
3 - Place the gear motor inclined
approximately 1º below the horizontal
line (fig 2 )
4- Fix the support plate A on the pillar
beside the leaf, taking in account the
X
measures shown in Table 1. Do not
forget inclination. They way to set the
fixing brackets will depend of pillar
material. It´s very important that the
brackets are well-fixed.
FIG 3
X
5 - Install the gear motor on to the
support plate A and fix it with the bolt.
4
6 - With gate's leaf closed, turn and
slide the screw of gear motor's D
shaft, until the end of the stroke
7 - Screw D shaft back on 1 complete
turn of 360º. (fig 4)
8 - Place B support plate in the hole
of D shaft and position it against the
gate leaf. It's very important to fix it
in a solid base. Fix it to the gate leaf
taking in account the inclination (point
nr.3).
9 - Proceed in the same way with the
FIG 2
other gate leaf.
10 - Connect the electrical wires and
safety devices: Place the mechanical
limit stops
11 – Place the cover on the
unblocking screw (C) (fig 5)