Krystal Pure KR5 Manual Del Propietário página 11

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

TROUBLE SHOOTING GUIDE (CONTINUED)
PROBLEM
CAUSE
Noisy drain or
Air gap faucet.
faucet.
Drain tube.
Hole on faucet
Drain clamp
is leaking.
slipped.
Drain tube loops or
dips.
Restriction in drain
tube.
Filter bowl
O-ring not sealed
canister leak
properly.
Water does not
Bad membrane.
taste or smell
right.
Filters have expired.
Little water use.
System needs sani-
tizing.
Little water
Over pressurized
from faucet.
tank.
Incoming water
pressure is below
40 PSI.
New system or fil-
ters just changed.
Bad check valve.
Tank valve not
open.
Bad storage tank.
Filters clogged.
Kinked tube.
System is
Shut off valve not
continually
working.
running.
Low city supply
water pressure.
Bad check valve.
Ice being made in
refrigerator.
System is new.
SOLUTION
A little noise is common with air gap faucets. Check
manual to be sure installed in proper location. Allow two
weeks for air to work out of system.
Check that drain tube from faucet is continuously down
hill to drain. Loops or dips will cause noise. Disconnect
drain tube and clean free of debris.
Align drain clamp hole with drainpipe hole.
Shorten drain tube from faucet until smooth down hill
flow to drain.
Disconnect drain tube and clean out restriction.
If damaged, replace. If dirty, clean, lubricate and retight-
en filter bowl. Hand tighten firmly.
Replace membrane when below 75% rejection and
sanitize.
Replace filters. Should be replaced every 6 to 12 months.
Drain or use entire tank. Should be done every 2 weeks
if low water use.
Sanitize (see Step 11: Recommended Sanitizing Instruc-
tions) and replace filters.
When empty, tank pressure should be between 5-12 PSI.
Increase pressure to 40 PSI with a pump.
System takes 4 to 12 hours to completely fill.
Replace check valve.
Open valve.
Replace storage tank. If not bad check that tank air pres-
sure is between 5-12 PSI when empty.
Replace filters.
Un-kink tube. If damaged, replace tube.
Replace shut off valve.
Increase water pressure to 40 PSI with a pump.
Replace check valves.
Nothing you can do, ice is made on demand.
Allow 2 weeks for air to bleed.
11

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Kr10Kr15

Tabla de contenido