Giatsu LION Manual De Usuario E Instalacion página 48

Idiomas disponibles
  • ES

Idiomas disponibles

3.INSTALLATION AND CONNECTION
3.1 Installation illustration
Installation items:
The factory only provides the main unit and the water unit; the other items in the illustration
are necessary spare parts for the water system ,that provided by users or the installer.
Attention:
Please follow these steps when using for the first time
1. Open valve and charge water.
2. Make sure that the pump and the water-in pipe have been filled with water.
3. Close the valve and start the unit.
ATTN: It is necessary that the water-in pipe is higher than the pool surface.
The schematic diagram is for reference only. Please check the water inlet/outlet label on the
heat pump while plumbing installation.
The schematic diagram is for reference only. Please check the water inlet/outlet label on the
heat pump while plumbing installation.
The controller is mounted on the wall
Chlorinator cell
Water inlet
Sand filter
(or other type filter)
11
Water outlet
Pool
Water pump
Valve
Water supply
loading