ECOFOREST VAP 30 Manual De Instalación Y Mantenimiento página 35

Ocultar thumbs Ver también para VAP 30:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Male eyebolt DIN580 M12
Broad brimmed washer DIN9021
M12
Hex nut DIN934 M12
Select appropriate slings to the weight of the boiler. (See specifications of the boiler).
Respect minimum elevation angle of the sling and verify proper load sharing between them.
If the lifting is done without having removed the hopper assembly - boiler body, the hopper must be empty.
Attention!: If the boiler is lifted in full, it will pitch. Lift carefully.
4.24. Check the space between the boiler, the fuel, and any flammable material, check drawing 8.
4.25. Do not install the boiler in a sleeping room.
4.26. The power cable provided by ECOFOREST is 1.4m long; you might need a longer one. Always use a cable with
ground plug.
FREE SPACES AND MINIMUM DISTANCES WITH FLAMMABLE MATERIAL.
x4
x4
x4
Drawing 7
LOCATION AND SAFETY DISTANCES.
34
Drawing 6
Tabla de contenido
loading

Este manual también es adecuado para:

Vap 38

Tabla de contenido