NEEDO T750H Manual De Uso página 41

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Now My NEEDO can be switched on and you can begin the initial installation – binding
phase.
One or more My NEEDO units have been purchased
If you wish to create two separate and isolated Needo networks in the same home, so that
each My NEEDO controls different radiators, the binding procedure must be done with one
My NEEDO at a time, while keeping the other unit and the radiators (that you don't want to
link to it) without power.
The radiator does not heat up
Verify that the radiator is receiving the correct power supply and that it is not set to stand-
by mode. If the problem persists, contact the Technical Assistance Service, report any
diagnostic messages that appear on the My NEEDO.
Power supply to the radiator was interrupted
When the mains power supply returns the radiator automatically recognises the connection
to the My NEEDO it was previously linked to.
Maximum number of radiators that can be installed
9 radiators can be installed for each My NEEDO.
Uninstalling radiators
The product must only be uninstalled by qualified engineers, in compliance with current
legislation. Before starting to uninstall, switch off at the main switch. In the case of models
that are heavier than 25 kg, the operation must be carried out by two engineers.
EN
41

Capítulos

Tabla de contenido
loading

Tabla de contenido