6. Startup and Shutdown
connected to the same number of PV modules.
6.1 Start up the inverter
When start up the single phase string inverter, should fellow below steps:
1. First switch on the AC breaker.
voltage and power, the inverter will start.
crystal will show that the inverter is self-checking.
4. If the parameter is within acceptable range, the inverter will generate energy.
6.2 Inverter Shutdown