Fun GFDI
Limiter
chapter 7.9.
to connect the energy meter.
For system wiring diagram, the red line refers to L line (L1, L2, L3), the black line refers to the
switch are determined by the power of load.
If there is no integrated DC switch inside the inverter you purchased, we commend you to
connect the DC switch. The voltage and current of the switch depend on the PV array you
access.
OFF
ON <<
- 24 -
Utility Power:
20W
-