Heat exchanger PWT 510 / PWT 910 / Installation and first start-up
5
Installation and first start-up
5.1 Safety instructions and installation and first start-up
5.2 Assembly
5.2.1 Requirements for the installation site
The foundation must be designed for the anticipated static and dynamic loads.
The foundation must be flat and solid.
The room must be frost-proof.
The room must be covered and dry.
The room must not have an aggressive atmosphere.
Condensation may damage the system components; ensure the room is well ventilated.
The room must be furnished with adequate lighting (at least 200lx).
Guarantee ease-of-access for service work.
Observe the minimum installation dimensions according to the installation plan. (See chapter 3.1)
The system components must be easy to access for cleaning.
The capacity of the floor drain and channel to be provided must be the correct size.
The floor drain must be resistant to the fluids used.
No vibrations must be transferred to the product from the peripheral equipment
22
Installation and first start-up should only be carried out by an installation
mechanic!
Work on the electrical equipment may only be carried out by electricians.
The electrical equipment in the system must be inspected regularly.
Loose connections and damaged components must be secured or
replaced immediately.
WARNING!
Danger to life as a result of faulty installation and first start-up!
Errors during installation may lead to life-threatening situations or cause
significant material damage.
Do not climb on the control system or its cabling.
Maintenance and cleaning work may only be carried out by specialists
when the control system is switched off, disconnected from the mains and
cooled down.