Epson BrightLink 475wi+ Guia De Instalacion página 75

Ocultar thumbs Ver también para BrightLink 475wi+:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

J
Adjust the vertical slide
1.
Loosen the M6 × 20 mm hexagon shoulder bolt (
2.
Adjust the vertical slide with the M8 hexagon bolt at the bottom of the wall mount, or the hexagonal
shaft at the top of the wall mount (
Tightening the M8 hexagon bolt lowers the wall mount, and loosening the bolt raises it.
Tightening the hexagonal shaft raises the wall mount, and loosening the shaft lowers it.
3.
Tighten the M6 × 20 mm hexagon shoulder bolt you loosened in the first step (
K
Turn off the display of the test pattern
Press the [Esc] button on the remote control or control panel to turn off the test pattern.
Warning
Tighten all screws firmly. Otherwise, the projector or wall mount may fall and cause personal
injury or property damage.
).
).
Hexagonal shaft
M6 × 20 mm hexagon shoulder bolt
M8 hexagon
bolt
35
).
Tabla de contenido
loading

Este manual también es adecuado para:

Brightlink 485wi+

Tabla de contenido