3.2
HARDWIRE INSTALLATION
!
WARNING:
IMPORTANT - Hardwire installation can be performed by certified electricians ONLY.
!
CAUTION:
Use 3 AWG, 90° C copper wire for L1, L2 and 8 AWG 90° C copper wire for Ground for fi eld wiring
installation.
A hardwire installation is required to permanently wire the Ultium PowerUP+ Charge Station to the main incoming supply.
1. Remove the two screws located at the end of the
front cover (keep the screws for reassembly) →
Remove the front cover.
3. Remove the four screws and washers that secure
the cable clamp → Remove the cable clamp (keep
screws, washers and cable clamp for reassembly).
NOTE: Components may have been removed for image clarity.
Date
ALL INFORMATION WITHIN ABOVE
BORDER TO BE PRINTED EXACTLY
31MAR23
AS SHOWN ON 8.5 x 11 WHITE 16
05APR23
POUND NON-BOND RECYCLABLE
PAPER. PRINT ON BOTH SIDES,
EXCLUDING TEMPLATES. TO BE
UNITED IN ACCORDANCE WITH
GMCCA SPECIFICATIONS.
Revision
First Rel
Second Rel
2. Remove the two service lid screws (keep the screws
for reassembly) → Remove the service lid using
pliers and pull on the tabs as shown.
4. Remove the blind plug from the opening for the
hardwire installation by loosening the securing nut.
NOTE: Components may have been removed for image clarity.
PART No.
R 05APR23
Auth
DR
Title
SAR
MB
SAR
MB
PART No.
5642869
SHEET
+
SHEET
EN
User Manual
9