5. Fit the o-ring (1) and conduit adapter (2) sup-
plied in the tool kit. Make sure a suitable 1" water
tight conduit (3) compliant to type 4X is used (not
supplied) → Push the new (round) cable through the
conduit.
1
2
3
NOTE: For illustration purposes only.
7. Install the cables in the terminals and tighten the
terminal screws as below.
1
L1
5 ft/lbs (7 Nm)
2
L2
5 ft/lbs (7 Nm)
3
GROUND
2.5 ft/lbs (3.5 Nm)
NOTE: Components may have been removed for image clarity.
9. Re-attach the front cover with its two screws and
tighten them to 0.7 ft/lbs (1 Nm). The hardwire
installation is now fi nished.
Date
ALL INFORMATION WITHIN ABOVE
BORDER TO BE PRINTED EXACTLY
31MAR23
AS SHOWN ON 8.5 x 11 WHITE 16
05APR23
POUND NON-BOND RECYCLABLE
PAPER. PRINT ON BOTH SIDES,
EXCLUDING TEMPLATES. TO BE
UNITED IN ACCORDANCE WITH
GMCCA SPECIFICATIONS.
2
1
Revision
First Rel
Second Rel
6. Secure the newly installed cable gland and conduit
→ Refi t the cable clamp assembly (from Step 3).
NOTE: Components may have been removed for image clarity.
8. Re-attach the service lid with its two screws and
tighten them to 0.7 ft/lbs (1 Nm).
3
10. To continue set-up of the Ultium PowerUP+ Charge
Station, refer to '5. OPERATING INSTRUCTIONS'
to do the following:
- Switching the charge station circuit breaker on/off
- Pairing to Bluetooth
- Downloading the GM MyBrand / Ultium app
- Setting-up a GM user account
- Charging an EV
NOTE FOR INSTALLATION ELECTRICIAN:
Make sure the correct operating amperage
has been set via the end users GM MyBrand /
Ultium app after set-up and pairing to the Ultium
PowerUP+ Charge Station (default operating
amperage 6 Amp).
PART No.
R 05APR23
Auth
DR
Title
SAR
MB
SAR
MB
®
5642869
PART No.
EN
SHEET
+
User Manual
SHEET
10