I
(4)
+
14
STEPS:
Parts:
Part 4 [x1) - Handle with Foam
Place the Handle with Foam (4) on top of
the Handle Uprights by pressing down
on the Snap buttons, sliding the Handle
down, and letting the buttons meet with the
openings to secure it.
STEP 9:
Parts:
Part 5 (x1] - Frame Pad
Place the Frame Pad (5] on top of the Jump
Mat. Make sure to stretch the skirt of the
Mat to cover the springs.
The Loop strings must be placed between
each Handle Uprights in order to be
tightened together.
STEP 10:
Tighten the loop strings onto all the legs of
trampoline to secure the Frame Pad, and
prevent it from shifting.
15