GE 18 Serie Manual Del Propietario E Instalación página 15

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
WHAT YOU WILL NEED (CONT.)
• AGE
water
supply
Mt (containing
robing,
shutoff
_dve
and fittings
listed
below)
is a_dlable
at extra
cost/_'om
yore" dealer
or fl'om Parts and Accessories,
800.626.2002.
* A cold water
supply.
The x<_ter pressure
must
be
between
20 and
120 p.s.i.
(1.4-8.1
bar).
• Power
drill.
• 1/2"
or adjustable
wrench.
• Straight
and
Phillips
blade
screwdriver.
• Two
1/4"
outer
diameter
compression
nuts
and
2 ferrules
(sleeves)--to
cmmect
the
copper
robing
to
the
shutoff
valxe
and
the
refrigerator
water
valve.
OR
• If _ou
are
usino._ ,u GE
Sma_lCmmect'"
Refrigerator
Tubing
kit, the
necessar}
fittings
are
preassembled
to
the
tubing.
• If your existing
copper
water
line has a flared
fitting
at the end, you will need
an adapter
(available
at
plumbing
supply
stores)
to connect
the water
line to
the refl'igerator
OR you can cut off the flared
fitting
with a tube cutter
and
then
use a compression
fitting.
Do not cut fl)rmed
end fl'om
GE SmartConnect>'
Refi'igerator
robing.
• Shutoff
valve to com_ect
to the cold water line.
The
shutoff
_ulve should
have a water
inlet with a
minimum
inside
diameter
of 5/32"
at the point
of
connection
to the COLD
WATER
LINE.
Saddle-t_pe
shutoff
_ulves are included
in many water
supply
kits.
gefl_re pro'chasing,
make
sm'e a saddle-type
_dve
complies
with your local plmnbing
codes.
]ustall
the
shutoff
valve
ou
the
uearest
frequeutly
used
driukiug
water
lille.
[] SHUT OFF THE MAIN WATER
SUPPLY
Turn
on
the
uearest
fimcet
hmg
euough
to clear
the
lille
of water.
[] CHOOSE THE VALVE LOCATION
Choose
a locatiou
fi_r the
valve
that
is easily
accessible.
It is best
to couuect
iuto
the
side
of a
vertical
water
pipe.
Wheu
it is uecessalw
to couuect
iuto
a hofizoutal
water
pipe,
inake
the
couuectiou
to the
top
or side,
rather
thau
at the
bottoln,
to
aw)id
drawiug
off auv
sedilneut
froul
the
water
pipe.
[] DRILL THE HOLE FOR THE VALVE
Drill a 1/4" hole in the water pipe (eveu it using a
sell:pierciug
valve),
usiug
a sharp
bit.
Reumve
auv
braTS
resultiug
fl'Oln
drilliug
the
hole
ill the
pipe.
Take
care
not
to allow
water
to drain
into
the
drill,
Faihu'e
to drill
a 1/4"
hole
Inay
result
ill reduced
ice productiou
or slnaller
cubes.
15
loading

Este manual también es adecuado para:

19 serie