Outsunny A33-028BU Manual Del Propietário página 15

Juego de tabla de remo de pie
Idiomas disponibles

Idiomas disponibles

SET-UP PREPARATION
1.Remove the board from the packaging.
Choose a smooth and clean surface and unroll your board so it lays
top-side up.
2.Valve operation
Follow the instructions below to inflate and deflate the ISUP properly.
The inflation valve is near the nose of the board. To close off the
valve for inflation, ensure the centre valve pin is in the UP position.
For deflation, press the valve pin so it is in the DOWN position.
Be careful of any sand or debris around the valve area when deflating
- small particles could become airborne with the release of the air
pressure.
Always lock the valve cover over the stem when in use. This will pre-
vent accidental air release and any particles getting into the openings.
-4-
loading