ESAB LAE 1000 Instrucciones De Uso página 24

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 37
ENGLISH
OPERATION
.
Turn the switch (1) to setting
"1".
The whi-
te lamp
(2)
should light up and the fan will
start.
.
Adjust the welding voltage using the knob
(3) on the
front
panel.
.
lf you
are using a remote connect
it
to the
socket (4) on the front panel and set the
toggle switch
(5) to
the remote setting.
.
Choose a suitable welding cable and re-
turn cab
le and connect these
to
+
and
-
on the front of
the
machine. Connect the
return cable to the work piece.
.
The rectifier is now ready for welding.
o
$ pin socket for external control
(6)
o
'l
pin socket
for
meter cable
(7)
.
Space for digital meters (8) (optional)
.
Yellow lamp (9) (overload cut-out)
I
2
ba10d001
MAINTENANCE
Blow
the power source clean at least once ayear using dry compressed air at re-
duced pressure.
lf
the power source is used in a dusty or dirty environment
it
should be blown clean
more often.
Ordering spare parts
When ordering parts please state the machine model, serial number and name and
spare part number as shown
in
the list of spare parts.
This facilitates dispatch and ensures a correct delivery.
0
ETIA
LAE
e
Þ
ba17d12e
-22-
loading