Overview; Rear; Installation; Overhead Rigging - EuroLite LED Floodlight 648/5 RGB Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OVERVIEW

Rear

(1) DMX IN
(2) DMX OUT
(3) Fuse
(4) Power supply
(5) Attachment eyelet
(6) Mounting bracket
(7) Microphone
(8) LCD Display
(9) Encoder

INSTALLATION

Overhead rigging

The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
20/52
51913855_V_1_0.DOC
Tabla de contenido
loading

Tabla de contenido