Adoption Of Personal Protective Equipment (Ppe) - Tecno-gaz ONE Manual Del Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 91
- Finally, pull down the handle POS. C to make the welding.
Fig.7
Now is the sealing:
The led for the time the transaction becomes yellow;
A peak energy for the set time will produce the weld;
Wait for the beep at the end of operation *
*
a triple beep will indicate the failure to observe the sealing time and the possible operation failed.
Finally, choose:
- Remove the handle to the starting position POS. C if you do not intend to make a
change any cuts in the vicinity of sealing;
- Cut the paper: keep pressed the moving lever and bring the handle pos. D to the
opposite side. Bring to the start position the handle pos. C.

ADOPTION OF PERSONAL PROTECTIVE EQUIPMENT (PPE)

There are no requirements for the adoption of personal protective equipment
(PPE).
15
ENGLISH
Tabla de contenido
loading

Este manual también es adecuado para:

2165s

Tabla de contenido