Erreka VULCAN D Manual Del Instalador página 60

Accionador hidráulico para puertas batientes residenciales
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
Adjust the opening and closing pressure
The opening and closing pressures must be
adjusted in line with the size and weight of the
gate.
O
Do not tighten the regulation screws (2)
and (3) to the maximum, as this may
cause damage.
56
Installation Manual
Clockwork turning increases the pressure for both
screws.
Anti-clockwork
pressure.
1 Open the cover (1).
2 OPENING PRESSURE: screw (2).
The "Opening Pressure" is, more exactly, the
pressure during the retraction of the spindle. In
inward opening facilities, it corresponds to the
opening operation.
In outward opening facilities, it corresponds to the
closing operation.
3 CLOSING PRESSURE: screw (3).
The "Closing Pressure" is, more exactly, the
pressure during the extension of the spindle. In
inward opening facilities, it corresponds to the
closing operation.
In outward opening facilities, it corresponds to the
opening operation.
4 Close the cover (1).
THE COVER (1) MUST BE CLOSED FOR THE
OPERATOR TO WORK PROPERLY.
P240I
turning
reduces
the
Tabla de contenido
loading

Tabla de contenido