C
S
ROSS
ECTION OF THE
*
The cross sections indicated in the table refer to a maximum length of 10 metres
**
The maximum length of the cables for connecting the Battery Box (optional) is 3 metres
Note:
C
ONNECTIONS
The first wire to be connected is the protective earth wire, which is to be inserted in the terminal
marked PE. During operation the UPS must be connected to the earthing system
THE IUT NEUTRAL MUST ALWAYS BE CONNECTED
Note:
C
ABLES
Cross section of cables (mm2)
*
捐
SR
SR
(optional)