ALLTRONIC SEMIS T33 Manual De Instalacion Y Uso página 120

Idiomas disponibles
  • ES

Idiomas disponibles

C
ONNECTIONS
The very first connection to be carried out is that of the protection conductor (earth cable).
The UPS must not operate without being connected to an earthing system
THE IUT NEUTRAL MUST ALWAYS BE CONNECTED
Note:
(optional)
loading