Installation Instructions
Step 4
Connecting Lead Cables
The installer must make sure the joint is properly supported during the fusion cycle and afterwards as the joint cools to
ambient. For underground installation the joint must be protected from soil falling into the fusion assembly area. If ambient
temperature has dropped below 60F in the last 24 hrs, we recommend the use of warming blankets to support, wrap, and
protect the pipe during the fusion process. With the Rionfuser unit connected to a dedicated power source and powered
ON, connect the lead cables to the coupling.
Connect lead cables
Step 5
Selecting Fitting Style
The unit will now prompt the installer to "SELECT FITTING STYLE". Scroll UP or DOWN to highlight the proper fitting style
being fused, then press START to select the fitting style.
Fitting style selection screen
Step 6
Selecting Pipe Size
Next the unit will prompt the installer to select size of the joint being fused. Scroll UP or DOWN to highlight the correct size,
then press START to select size.
Fitting size selection screen
5