5.Solar panel installation diagram
Customers have to install the connecting part between the solar panel & bracket; the referring part inside
the dotted line circle is the supporting base for solar panels
If the DIP switch on the main machine stays open for long time, the battery capacity will be used up.
They will cause the battery at hibernation state, and at this time, the solar panels voltage will be lower
than the working voltage of the inside controller. the battery can start working again only after activation
charging, and the ways of activation charging are as follows
1.If the sunshine is good, please insert the solar panel plug to the LOAD socket on the front side of the
machine. After 10 to 20 hours, the battery can be activated. If this watt is not feasible, please try the
following one;
2.Connect 20V/30A high-voltage, high-current every 2 seconds. After 5 to 10 mins, please use method
one again.
P-5