Install The Upper Handle; Install The Grass Catcher; Install The Mulch Plug; Install The Side Discharge Chute - GreenWorks Pro MO80L410 Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7.3

INSTALL THE UPPER HANDLE

15
14
13
1. Align the holes in the upper handle(3) and the lower
handle(13).
2. Put the bolts(15) through the holes.
3. Tighten the knobs(14) onto the bolts(15).
4. Do the same operation on the other side.
7.4

INSTALL THE GRASS CATCHER

4
16
17
18
19
1. Remove the mulch plug.
2. Remove the side discharge chute.
3. Open the rear discharge door(4) and hold it.
4. Hold the the grass catcher(17) by its handle(16) and
engage the hooks(18) on the door rod(19).
5. Close the rear discharge door(4).
7.5

INSTALL THE MULCH PLUG

11
21
English
3
14
4
1. Remove the grass catcher.
2. Open the rear discharge door(4) and hold it.
3. Hold the mulch plug(11) by its handle(21) and fit it in
the discharge chute.
4. Close the rear discharge door(4).
7.6
INSTALL THE SIDE DISCHARGE
CHUTE
23
CAUTION
When you use the side discharge chute,
do not install the grass catcher.
keep the mulch plug installed.
1. Open the side discharge door(7) and hold it.
2. Line up the recesses(23) of the side discharge chute(12)
below the pivot(22).
3. Close the side discharge door(7).
7.7

SET THE BLADE HEIGHT

The machine can be set to different blade heights.
6
1. Pull the height adjustment lever (6) rearward to increase
the blade height.
2. Pull the height adjustment lever forward to decrease the
blade height.
9
7
22
12
EN
Tabla de contenido
loading

Tabla de contenido