Kohler K-16131-4-AF Guia De Instalacion página 9

Grifería de bidé
Idiomas disponibles

Idiomas disponibles

Nut
Union
Compression
Hot
Cold
7. Supply Connections
Connect the supply tubes to the handle valve (inlets) and then the
supply stops. (Left is hot - right is cold.)
Tighten all connections.
8. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Remove the aerator. Point the spray nozzle down.
Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks. Turn valves
off.
Turn off the water.
Remove any debris from aerator and reinstall.
Kohler Co.
Spout
Aerator
9
116369-2-AB
loading

Este manual también es adecuado para:

K-16131K16131-4a-bvK-16131-4aK-16131-4-bvK-16131-4