Erreka ERGOS 160 Guía Rápida De Instalación Y Programación página 11

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
Turning direction check:
After completing the connections, connect the power
supply and press A.T. (ST1). The first operation carried out
after connecting the power supply is opening. If closing
is to be carried out instead of opening, interchange the
cables connected to cable connectors 9 and 10.
L
Phase
N :Neutral
T
:Earth
125V
50/60 Hz
220V
50/60 Hz
1 Connect the operator to the mains as shown in the
figure: the N terminal connects to Neutral and the
L1 and L2 terminals connect to Phase through the
key switch (K). Also connect the earth cable (T).
Electrical connections with CLEVER01 control board
Electrical connections without control board
K
Check the control panel instructions for further
details on installation.
T
2 After connecting, check rotation direction by
operating the key switch. If the turning direction
is not correct, interchange the cables L1 and L2.
230Vac, 50/60Hz
L
N
125Vac, 50/60Hz
T
L1
N
L2
T
L1
N
L2
E270X
P270Z
11
Tabla de contenido
loading

Este manual también es adecuado para:

Ergos 200Ergos 280Ergos 360

Tabla de contenido