Palmako FRA28-2121 Instrucciones De Montaje página 6

Idiomas disponibles

Idiomas disponibles

Installation manual
Preparation of components:
Sort the components based on the
wall
plans
(see
specifications) and place them at
the four sides of the house in the
installation sequence.
ATTENTION: Never place the
components directly on grass or a
muddy surface because it will be
very difficult or even impossible to
clean them up later!
Foundation
A good foundation is the most important aspect guaranteeing the duration and safety of your house.
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the
house, its stability and especially the matching of the doors. With a good foundation, your house will
stand for many years more.
Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At
the same time make sure that there are sufficient air apertures under the house floor for ventilation.
We recommend the following foundation options:
Strip or spot foundation
Foundation from concrete or pavement slabs
Cast concrete bed
Prepare the foundation so that the foundation joists are propped up on every side with intervals not
exceeding 50-60 cm.
Consult an expert in this field or have the foundation prepared by specialists.
3 Garden house assembly
ATTENTION:
 You will find included in the house package one spare log (longest wall log).
 You will find included in the house package one spare board (longest roof or floor board).
 The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm
long).
All of the details listed above ARE NOT mentioned in the specification list.
 The drawings have the details marked with three-digit position numbers. The exact positions of
those details that have the third digit "x" can be found in the specification list.
Technical
loading