Garden House Assembly - Palmako FRX70-5341 Manual De Montaje

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Installation manual
Preparation of components:
Sort t he components based on
the wall plans (see Technical
specifications) an d p lace them
at the four sides of the house in
the installation sequence.
ATTENTION: Never place the
components directly on grass or
a muddy surface because it will
be v ery d ifficult or
impossible t o c lean t hem up
later!
Foundation
A good foundation is the most important aspect guaranteeing the duration and safety of your house.
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the
house, its stability and especially the matching of the doors. With a good foundation, your house will
stand for many years more.
Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At
the same time make sure that there are sufficient air apertures under the house floor for ventilation.
We recommend the following foundation options:
Strip or spot foundation
Foundation from concrete or pavement slabs
Cast concrete bed
Prepare the foundation s o that the foundation joists are pr opped up on every side with intervals not
exceeding 50-60 cm.
Consult an expert in this field or have the foundation prepared by specialists.

3 Garden house assembly

ATTENTION:
 You will find included in the house package one spare log (longest wall log).
 You will find included in the house package one spare board (longest roof or floor board).
 The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm
long).
All of the details listed above ARE NOT mentioned in the specification list.
 The dr awings ha ve t he details marked w ith t hree-digit pos ition n umbers. The e xact pos itions of
those details that have the third digit "x" can be found in the specification list.
ev en
Tabla de contenido
loading

Tabla de contenido