Novoferm NovoDock L550i Instrucciones De Montaje página 13

Idiomas disponibles
  • ES

Idiomas disponibles

8.1
Instruction
Paint the welded seams with the touch-up paint included in the scope of supply in order to prevent rust formation.
The front plate shown in the figure may not be required in combination with certain options. When docking buffers are
installed, the front plate is not used. Depending on the design, the docking buffer plate included in the scope of supply
should be welded in place. Please refer to the corresponding assembly instructions for this.
General instruction: The image may differ at detail level.
Docking buffers (not included in the leveller scope of supply).
Protect the docking platform and vehicles with suitable docking buffers. Docking forces in excess of 100 kN may require
special measures. Please ask your supplier or the manufacturer.
This installation manual must be given to the customer and kept safely during the entire period of use!
8. Optional front plate
II
9. Optional buffers
EN
11
loading