Haier 3U55S2SR3FA Manual De Instalación página 15

Acondicionador de aire multi-split
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
Refrigerant Charging Procedures
The following requirements are added as the supplementation of conventional procedures:
Requirements on storage site of refrigerant
Scrapping and Recovery
Scrapping
Note:
The air conditioner shall be marked (with dates and signature) after being scrapped and the refrigerant is discharged.
It shall be guaranteed that the sign on the air conditioner can reflect the flammable refrigerant charged inside.
Recovery
loading

Este manual también es adecuado para:

3u70s2sr3fa4u75s2sr3fa4u85s2sr3fa5u90s2ss3fa5u105s2ss3fa