Commissioning And Operation - WIKA IV10 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation

5.2 Commissioning and operation

To close the valve, turn the handle in a clockwise direction as far as the
stop. To open the valve, turn the handle anticlockwise as far as the stop.
It will take approximately 4 turns from open to closed and vice versa.
The flow can be controlled by not totally opening/closing the valve.
Please note that the handle may present a slight play and
spin freely up to a quarter turn when in the depressurised
state. This is due to the constructive design.
The valve, especially the handle, must not be subjected to any exter-
nal loading (e.g. use as a climbing aid, support for objects).
The handle may only be used by hand; the use of tools is not
accepted.
The torque on reaching the valve stop must only be hand-tight.
Ensure that all valves of the product are closed prior to opening the
main valve of the process line.
WIKA operating instructions, shut-off valves and valve manifolds
EN
15
Tabla de contenido
loading

Este manual también es adecuado para:

Iv11Iv20Iv21Iv30Iv31Iv50 ... Mostrar todo

Tabla de contenido