Napier Sportz 82000 Instrucciones página 5

Idiomas disponibles

Idiomas disponibles

setting up the awning
A. Assemble the awning poles by
16
unfolding each section.
B. Place the end of the pole with the
pin through the grommet hole at the
BEFORE
corner of the awning.
C. Place the ring end of the guy line
over the pole pin located at the top
YOU BEGIN
of the awning. Place the awning cap
over the pin.
A. Stake the bottom loop of the guy
17
For set up video,
line (bottom portion of plastic slider)
scan QR code or visit
to the ground with a peg. Repeat for
www.napieroutdoors.com
all awning guy lines.
B. Adjust the lenth of the rope by
pushing the plastic slider upwards
until the line is tight.
To install the gear loft, place each
18
corner hook of the gear loft into
the loop located on the ceiling of
the tent.
16 c
17A
17 B
loading

Productos relacionados para Napier Sportz 82000