SOMFY Roll Up 28 WF RTS II Instrucciones página 5

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 83
Roll Up 28 WF RTS II
2.INSTALLATION
CAUTION
• These instructions are mandatory for the home motorisation and
automation professional installing the drive.
• Never drop, knock or puncture the drive or immerse it in liquid.
• Install an individual control point for each drive.
NOTICE
Make sure that LED, programming button and input connection remain visible and
easily accessible after installation.
2.1.Assembly
2.1.1.Preparing the drive
CAUTION
Roll Up 28 WF RTS II : interior diameter of the tube has to be Ø26.6 mm or
greater.
1] Fit the crown (a) and drive wheel (b) to the
motor.
2] Measure the length (L) between the end of
the drive wheel and the head end.
2.1.2.Preparing the tube
1] Cut the tube to the required length.
2] Deburr the tube and remove the debris.
©
Copyright
2021 SOMFY ACTIVITES SA. All rights reserved.
1]
2]
1]
2]
EN
(a)(b)
5
loading