Hkoenig bw1880 Manual De Instrucciones página 16

Ocultar thumbs Ver también para bw1880:
Idiomas disponibles
  • ES

Idiomas disponibles

Figure 10
3. Open the beer cooler with 60-80N strength and place the well-
assembled keg into the cooling cavity; Connect the CO2 connector tube
and beer outlet tube with the keg lifter tube connector.
NOTES: make sure all connection of tap mechanism is well connected,
and without damage. And make sure tap valve is on close status, and the
CO2 pressure regulator knob is at "Off" status.
Close
Open
Figure 13
4. Loosen the CO2 bottle sheath (Show as figure 15), insert a 16gram
CO2 cartridge in the sheath (Figure 16), and screw the sheath tightly until
you will hear a "Click"(Figure 17), which indicates that the cartridge seal
has been pierced and the CO2 gas can flow into the keg freely. Make us
the bottle sheath is fixed tightly to avoid the CO2 leakage. Then put CO2
bottle sheath into the top cover.
Beer dispensing unit
Keg seal
Beer keg
Figure 11
Figure 14
Beer connector
CO2 connector
Figure 12
loading