Hkoenig bw1880 Manual De Instrucciones página 15

Ocultar thumbs Ver también para bw1880:
Idiomas disponibles
  • ES

Idiomas disponibles

in the cooling cavity.
The max water level line
B. OPERATION
Universal 5L beer keg
1. Before piercing the plug on the top of the keg, you must always follow
the instructions marked on the keg to eliminate the excess gas and ensure
that the keg has rested long enough to avoid foam coming out through
the tap faucet.
2. Uprightly direct the piercing pin against the sealant on the upper and
then push the piercing pin all immerse in the keg quickly.
To assemble the tap mechanism until you hear a "Ka" sound that will
indicate the tap mechanism fixes on the beer keg. (Show as figure 10)
Figure 9
Make
sure the
drain
switch is
at "OFF"
position.
Figure 10
loading